Change History
- 2001-05-03-19:53 Align with DMware Construction-Structure Audit
(orcmid)
- The construction-structure is cleaned up to fit with the current DMware
structure as part of general upgrading of the DMA section.
-
- 2000-03-12-12:31 Create Initial DMware-ready project for InfoNuovo.com
(orcmid)
- Package integration material so that it has a Zip package and is DMware-ready.
Have the project be available for addition of further projects related to the DMA
1.0 integration model and extensions.
-
- 2000-02-20-16:03 Adjust to Current Construction Structure (orcmid)
- 1. Introduce this Construction Log.
2. Recover history of this level of the DMA project.
3. Adjust index.htm to follow the construction structure.
-
- 1999-06-19-00:29 Introduce Information from June 1999 DMA Technical Committee
Meeting
- The overall integration slides from the DMA Technical Committee meeting are placed here
as Microsoft Powerpoint.
-
- 1999-06-08-05:33 Introduce Integration Project and MNCS Subproject (orcmid)
- This project existed in various computer folders, even under configuration management,
but this is the time that material was first brought to the InfoNuovo.com development
server for publication via www.infonuovo.com on VServer.
- 1. Create integration subproject area and began
developing content here, along with its MNCS Subproject.
2. Provide nothing else, initially, but an obligatory index.htm
page required for structural integrity of the site.
created 2000-02-20-16:03 -0800 (pst) by orcmid
$$Author: Orcmid $
$$Date: 01-05-03 19:55 $
$$Revision: 5 $