|
|
c080601
NuovoDoc
Construction Note |
|
Status |
Date |
Description |
|
| 2008-06-04 |
|
||
| in progress | 2013-11-29 | c080601: Repave to current Construction Structure styles and formats: c080601, c080601a, c080601b, c080601b1, c080601c, c080601c1, c080601c2, c080601c3, c080601c4 | |
| 2008-07-20 | Review #60 NuovoDoc Repaving items, starting back at #60.158 | ||
| 2008-07-19 | c080601: Re-align the tree structure in Table 1 to be uniform and nicely left-justified | ||
| in progress | 2008-07-19 | Foyer: Do the breadth-first spread through the top-level subordinates, managing from the Front Porch Construction Zone | |
| 2008-06-24 | c080601c: The different inserts should list the nature of the style inclusions. It is going to be important to repave construction/templates/00/ with the information that applies to styles. For normal documents, there are important styles for catalogs, diary & job jars, etc. There need to be templates for folios (that would handle some of this) too. Some of this could be at the nfoCentrale.net level also. [dh:2008-06-24 There is enough information here on the bootstrapping and the notices. The notices might link to the relevant sections of the construction templates, when those indicate the rules being followed. That is not urgent.] | ||
| 2008-06-24 | "Go green" all the way to the front porch when the template customizations are complete | ||
| 2008-06-24 | Review and customize c000005 | ||
| 2008-06-24 | Review and customize c000004 | ||
| 2008-06-24 | Review and customize c000003 | ||
| 2008-06-24 | Conduct review of the Construction Material content, operating from that Construction Zone | ||
| 2008-06-24 | c080601c: Reduce the business in the version progression block | ||
| 2008-06-24 | c080601c: Fix the spacing in the bulleted lists | ||
| done | 2008-07-20 | c080601c1: Correct the title for NuovoDoc repaving | |
|
done 2008-07-20 |
2008-07-19 | c080601: Put links to foyer structure/zones in the table | |
|
done 2008-07-20 |
2008-07-19 | c080601: Correct page title for NuovoDoc | |
| done | 2008-07-19 | Foyer: Start the Construction Zone | |
| done | 2008-07-19 |
|
|
|
done 2008-07-19 |
2008-06-24 | c080601: There should be a link to the construction structure and construction zone descriptions when they are available. This is for checking on changes that may be pending or in progress that someone might review when verifying a problem. | |
|
done 2008-07-19 |
2008-06-24 | c080601: Create a table that shows what modifications were done and when they were done. [dh:2008-06-24 This is accomplished by basically replicating the construction structure of the site and indicating when each node goes green.] | |
| done | 2008-06-24 | Review and customize c000006 | |
| done | 2008-06-24 | Verify that the construction structure is stitched through this folio correctly, allowing that part to be marked as completed. | |
|
done 2008-06-24 |
2008-06-04 |
This notice applies to this folio. It signifies that the pages of this folio are of correct form and customized for this site. [dh:2013-11-29 There are more Style and Format adjustments introduced since. These are being promulgated as part of revival of this same repaving.] |
|
| done | 2008-06-24 | c080601: Revamp text to apply to repaving | |
| done | 2008-06-24 | c080601c: Revamp text to apply to repaving | |
| done | 2008-06-24 | Identify this material as being repaved with the c080201b1 include page. | |
| done | 2008-06-24 | Create placeholder ready for further customization to make the NuovoDoc-specific Site Repaving project: c080601, c080601a, c080601b, c080601c, c080601c1, c080601b1, c080601c2, c080601c3, c080601c4 | |
|
done 2008-06-24 |
2008-06-04 |
Customize this page for immediate usage. |
|
|
You are navigating
construction material of NuovoDoc. |